Thursday 26 May 2011

Assembling the set

To assemble the set we first created header and footer wooden stands onto which we attached some of the completed flats. THese were plotted out into areas where structural integrity was needed, namely outside corners of rooms and angled joins. Once these were in place and stable it was simly a matter of screwing each flat onto the next in succession until the rooms were fully assembled. Though simple this job required a lot of man power due to the weight and lack of structural integrity during assemble with each board taking anything up to three or four people to attach.

Fellow Group Members assembling The fireplace section of our set.


The set half assembled. Note the support struts in the doorframe area.

No comments:

Post a Comment